caltrans lane closure charts

Midblock worksites should not cause pedestrians to skirt the worksite or make a midblock crossing. State Route 210 Information | Highland, CA Channelizers are paid for by the unit. Under the agreement, Caltrans pays the CHP for furnishing officers and cars for construction zones. Verify temporary flashing beacon systems are relocated as work progresses according to the specifications. Section 12, Temporary Traffic Control, directs the contractors attention to the. District 4 Planned Lane Closures Search for Lane Closure information using the options below. 11/25. Withhold some payment from progress pay estimates to cover the cost of removing temporary crash cushion modules. TMP strategies are designed to maintain additional delays below this maximum threshold, that is, less than 15 or 20 minutes. Confirm the contractor submits a schedule of planned closures in advance as required by Section 12-4.02A(3), Submittals, of the Standard Specifications. Remind the contractor of Americans with Disabilities Act requirements if the traffic control system will affect pedestrian traffic and a temporary pedestrian access route is needed. Drums used instead of cones, barricades, or delineators as part of a traffic control system or used as specified under Public Safety section in the contract are not to be paid for at contract item price. Form CEM-2303, Temporary Pedestrian Access Route Sidewalk Detour Inspection Report, may be used by the engineer and the contractor to report weekly inspections if the temporary pedestrian access route is provided using an existing pedestrian route. Record inspection dates and conditions observed in the project records. Be aggressive in seeking changes to improve the situation. When construction activities involve railroad rights-of-way or grade crossings, contact the district railroad liaison agent to confirm that all processes are complete and that the contractor may begin work. AALRR Scores Major Win for AGC-San Diego in Arbitration Against the District 4 Lane Closures - California Visit Quickmap@dot.ca.gov for latest road info. Compensation for flaggers shown on the contract plans, including advanced flaggers and additional flaggers will be included in the bid item for traffic control system. Consider placing supplemental tapers within an existing closure. The Code of Federal Regulations, Title 23, Section 630, Subpart J, Work Zone Safety and Mobility, (23 CFR 630 Subpart J) requires Caltrans to adopt a policy that implements TMPs on all federally funded highway projects. SEE NOTE 2 END ROAD WORK G20-2 B 100' 10-20-10 48" x 24" 237 If you cannot contact the local CHP coordinator in advance and the officer reports for duty, the fee will be equal to 4 hours of overtime pay and mileage incurred, if any. Check for live traffic conditions. Road Conditions - California The California MUTCD Part 6 contains figures that can be adapted for traffic-handling plans. The district will establish a procedure for preparation, review, and approval of changes related to roadway construction and detour plans that include traffic control devices. Do not allow the use of power from private parties to power the temporary flashing beacon system. The Caltrans QuickMap drop down menu labeled Options enables the layer to be turned on or off. Verify all new and used temporary railing elements comply with requirements for end connection and surface finish. Verify the channelizers post is predominantly orange. 2 Comments. Obtain self-certification using Form TR-0030, "Work Zone Category 1 Temporary Traffic Control Device Certificate of Crashworthiness," from the contractor. The contractor should develop a plan for handling emergencies and emergency vehicles in the control zone. In addition to required openings through falsework, provide accessible pedestrian facilities during pile driving, footing, wall, and other bridge construction activities where an accessible route was available before construction began. Section 7-1.04, Public Safety, requires that the contractor provide for the safety of the public during construction. It is an enhancement tool for construction zones and is not intended as a replacement for other temporary traffic control measures. If the contractor plans to use cones for night work, determine the type of cone proposed. Responsibilities include: The construction engineer is responsible for confirming that traffic moves through the work zone according to traffic control plans. Check pallet heights when used. If sight distance is not adequate, contact the district traffic engineer for suggestions or recommendations. Maintenance funded projectson maintenance projects, obtain additional funding through a request to the district Maintenance Unit. Confirm that the minimum lane widths in the standard special provisions and those shown on the Traffic Handling Plans match. Refer to Section 4-1202C (1a), "Lane Closure System," of this manual. Users include motorists, bicyclists, and pedestrians within the highway, including persons with disabilities, defined by the Americans with Disabilities Act of 1990 (ADA). Do not allow the use of a damaged impact attenuator vehicle. Notify Me. Move the workers and equipment onto the closed lanes only after all system components are in place. Road closures and delays are subject to change due to weather. Look in the resident engineers pending file for design assumptions and estimate calculations. If the contractor requests usage of alternative temporary crash cushion modules, verify that their proposed modules are on the Authorized Material List for Highway Safety Features. Portable delineators are paid for as part of the contract item for the traffic control system. Confirm that the task order, which has five parts, is completely filled out. Use the posting of advisory speeds on warning signs to advise the public what speed is considered appropriate at specific locations, such as points of curvature or traffic diversion. Require proper maintenance of plastic traffic drums. How the contractor will meet the projected rates for material delivery to the job site. Check the contractors layout work. Verify that the trailer bearing the sign can be leveled and that the sign operates within the required minimum and maximum heights. Do not allow the contractor to use the double-stick butyl pads provided by the channelizer manufacturer; these pads do not meet Caltrans requirements. Verify the lights are not glaring into approaching traffic, especially truck traffic. The CSC should document the reviews in the project records and discuss concerns about the traffic control plan or traffic safety with the construction engineer, traffic engineer, and resident engineer. Determine the exact location of the temporary signs and when they are no longer needed for the direction of traffic. Confine the work area to as short a distance as practical. QuickMap Know before you go. Design crossover transitions to the highest geometric standards within tolerable limits of cost. Temporary pavement markers will not adhere to a cold in-place recycling surface. Before opening a roadway to unrestricted public traffic, the final delineation must be in place on the roadway either by using long-term or short-term temporary delineation or channelizing devices. Provides pedestrians with a reasonably safe, convenient, and accessible path that replicates, as nearly as practical, the most desirable characteristics of the existing sidewalks or footpaths. Inspect all traffic control devices to verify conformity with the specifications. Inspect the signs and equipment the contractor proposes to use, at the contractors or subcontractors yard if possible, before their first use. Updated information available at # caltrans8 TMC ALERT Design for the speed that vehicles will travel. If the contractor requests additional CHP support beyond what the project plan includes, you may, if appropriate, write a change order. Frequently, the only exception to an otherwise clean roadside is a localized situation such as a partially completed drainage structure or a pile of rubble. As early as possible, verify that all Department-furnished equipment is available at the location specified. California Department of Transportation | Caltrans In the daily report, enter a description of the services the CHP provided, such as traffic breaks, stationary patrol upstream of the work area, or circulating patrol, and complete the CHP officer and CHP vehicle information. These instances do not require formally approved plans. Maintain a width of 60 inches throughout the length of the pedestrian pathway. Click on any marker to get project details as of March 1, 2023. The Angeles CREST Highway (SR-2) is in the jurisdiction of Caltrans. Subsequent relocations of each barricade are paid for as extra work using the force account method. The cross slope must be no greater than 1:50 (2 percent) and the running slope no greater than 1:20 (5 percent). Sometimes through traffic tends to follow an exiting vehicle. Payment is computed as extra work. Include these considerations for conditions requiring minor changes in the field: The following guidelines apply to crossover transitions: For temporary modifications of existing ramps, review acceleration and deceleration lanes. Speed management is desirable at locations such as rural freeways and expressways where traffic has been flowing in a high-speed, free-flow way for a significant period before encountering the work zone. The district Construction office and the resident engineer should confirm that the contractors activities are compatible with the TMP that affects the project. Alert Caltrans Traffic Map Chain Control Map Route Conditions State Route Closures CHP Incidents TMC ALERT Interstate 10 (I-10) is closed between Route 86 and Route 177 due to storm damage. Both the senior officer and the project supervisor should sign the completed COZEEP daily report. Try to eliminate surprise elements from temporary roadways. Serves as a liaison between Construction, the DTM, and the TMP manager. Call on Caltrans work forces only because of a physical inability of the contractor or a refusal by the contractor to act. Cold storms bringing wind, rain and low-elevation snow heavy at times are forecast through early March. Inform the Transportation Permits Unit 15 days in advance of the closure. If the portable signal system is out of operation, the contractor must provide flaggers to control the traffic until the traffic signals are in operation. Reviewing periodically the traffic control setup for each work zone and discussing any deficiencies with the resident engineer. Chapter 1 - Caltrans Construction Organization, 4-1202B Temporary Traffic Control Devices, 4-1202B (10) Temporary Crash Cushion Module, 4-1202B (14) Portable Changeable Message Signs, 4-1202B (16) Temporary Flashing Beacon Systems, 4-1202B (17) Automated Work Zone Information Systems, 4-1202B (18) Portable Transverse Rumble Strips, 4-1202B (19) Portable Radar Speed Feedback Sign Systems, 4-1202B (20) Automated Flagger Assistance Devices, 4-1202B (21) Temporary Automated End of Queue Warning System, 4-1202C (2)Temporary Pedestrian Access Routes, 4-1202C (3) Bridge Cleaning and Painting Activities, 4-1203B Temporary Traffic Control Devices, 4-1203B (10) Temporary Crash Cushion Module, 4-1203B (14) Portable Changeable Message Signs, 4-1203B (16) Temporary Flashing Beacon Systems, 4-1203B (17) Automated Work Zone Information Systems, 4-1203B (18) Portable Transverse Rumble Strips, 4-1203B (19) Portable Radar Speed Feedback Sign Systems, 4-1203B (20) Automated Flagger Assistance Devices, 4-1203B (21) Temporary Automated End of Queue Warning System, 4-1203C (1b) Contingency Plans for Closures, 4-1203C (1d) Status Updates for Authorized Closures, 4-1203C (1f) Placement Sequence and the Start of Work, 4-1203C (1i) Reverse Operations Inside Closures, 4-1203C (2)Temporary Pedestrian Access Routes, 4-1203C (3) Bridge Cleaning and Painting Activities, 4-1203D (3) Temporary Lane Line and Center Delineation, 4-1203D (4) Temporary Edge Line Delineation, 4-1203D (5) Temporary Traffic Stripe Tape, 4-1203D (6) Temporary Traffic Stripe Paint, 4-1203D (7) Temporary Pavement Marking Tape, 4-1203D (8) Temporary Pavement Marking Paint, 4-1203E Temporary Pavement Delineation for Seal Coats, 4-1206B Temporary Traffic Control Devices, 4-1206B (9) Temporary Crash Cushion Modules, 4-1206B (13) Portable Changeable Message Signs, 4-1206B (15) Temporary Flashing Beacon Systems, 4-1206B (16) Automated Work Zone Information Systems, 4-1206B (17) Portable Transverse Rumble Strips, 4-1206B (18) Portable Radar Speed Feedback Sign Systems, 4-1206B (19) Automated Flagger Assistance Devices, 4-1206B (20) Temporary Automated End of Queue Warning System, 4-1202 B (14) Portable Changeable Message Signs, 4-1202C (2) Temporary Pedestrian Access Routes, 4-1203C (2) Temporary Pedestrian Access Routes, CalOES: Power Outage and Fire Recovery Resources.



Relief Factor Police Woman Tracy, Park Packing Weekly Ad, Cantilever Bridge For Posterior Teeth, Trucker Convoy 2022 Schedule, Articles C

caltrans lane closure charts

Because you are using an outdated version of MS Internet Explorer. For a better experience using websites, please upgrade to a modern web browser.

Mozilla Firefox Microsoft Internet Explorer Apple Safari Google Chrome